Year Contract name Employer
2006 Performance of works on construction of the reservoir “Gajani” for water supply system of Maglajani spring Reservoir V=1000 m3 Municipality of Laktasi
2007 Execution of works on construction of regulation of a part of riverbed of Siroka river (from the end of an existing regulation to the bridge in Mlade Cusica St.) in Banja Luka City of Banja Luka
2002-2006 Execution of works on a part of water supply system from Povelic spring northern part of the Municipality of Prnjavor-LC Sibovska, V.Ilova, Grabik (1.609.120,56+801.305,85)
-PEHD pipeline Ø 160-335 – 9,9 km;
- Reservoirs V=2x500 m3

- Pumping stations 2x36,4 l/s. Execution of works on a part of water supply system from Povelic spring northern part of the Municipality of Prnjavor-LC Sibovska, V. Ilova, Grabik (1.609.120,56+801.305,85)
- PEHD pipeline Ø 160-335 – 9,9 km;
- Reservoirs V=2x500 m3
Pumping stations 2x36,4 l/s
Municipality of Prnjavor
2008 Transport pipeline and distributive network on the section Vrbaska – Podgradci
-PEHD pipeline Ø40-315; 119,03 km;
-3 pumping stations 28,5 l/s;
-2 reservoirs V=50 and V=300 m3.
Water supply and sewerage system Gradiska
2008 Delivery, installation and performance of outdoor water supply and sewerage system Pevec d.o.o. Banja Luka
2011 Performance of works on construction of water supply system in the Municipality of Laktasi
(3.197.024,87+572.080,28+1.075.828,19)
-PEHD pipeline Ø 160-400 80,82 km; 3 reservoirs 500 m3 and 2x100 m3; pumping and chlorine stations 2x3,9l/s and 2x18,05 l/s
Strabag AG
2010 Construction of primary pipeline Ø 800 mm in Zapadni transit (section from Trive Amelice St. concluded with roundabout)
-DCI pipeline 0,70 km
City of Banja Luka
2011 Water supply of second high altitude zone in settlement Cesma (works on a reservoir of 1000 m3, equipment and electrical works and equipment for pumping station)
-reservoir V=1000 m3
City of Banja Luka
2014 Reconstruction and expansion of water supply network in Poljavnice, Ravnice and Vodicevo neighborhood, municipality of Novi Grad
Construction of water supply network:
-PEHD pipeline from Ø 25 mm to Ø160 mm, 34,81 km
-Pumping station
-Reservoir V=100 m3
Municipality of Novi Grad
2012-2013 Urban water supply and sewerage system, Banja Luka
Lot 1 – water supply
-PEHD pipeline DN 63-225 – 11,90 km,
-DCI pipeline DN 350 and 500 – 5,5 km,
-House connections – 1080 pcs
-reconstruction of traffic route
City of Banja Luka
2014-2015 Construction and reconstruction of water supply system in municipality of Laktasi – first phase LOT 1
-PEHD pipeline from Ø25 mm to Ø315 mm, 103,00 km
-pumping station
-reservoir V = 100 m3
Municipality of Laktasi
2011- Performance of works on regional water supply “Crno Vrelo” (Donji Pervan-Petrov Gaj) for Lot 1 Shared facilities
-PEHD pipeline 23,77 km;
-reservoir 500m3;
-booster device with three pumps 11l/s;
-water sedimentation tank; technological equipment and remote control
Center for development and advancement of village and Municipality of Prijedor
2016 Reconstruction of urban water supply network, sanitary protection of Mlakva spring and construction of primary water supply network Rudice and Blatna Municipality of Novi Grad
2015- Reconstruction and expansion of water supply system in the town of Prijedor Town of Prijedor

Gallery

Pin It

We appreciate the needs of our clients and guarantee quality and professionalism!